SEO Program -Traffic is the Key
Our SEO program is a powerful and thoroughly researched solution. All our Search Engine Optimization projects are handled by experts and follow a systematic process to analyze and deep-optimize websites using proven techniques.
Defined briefly below, are the systematic phase-wise steps we follow to address the requirements of a website for Search Engine Optimization:
- Phase 1: Research and Analysis: Spanning approximately 2 weeks, Phase 1 includes the following deliverables:
- Ranking Capacity and Beta Submission Report and Submission report.
- Search Engine Friendliness Analysis & Recommendations.
- Keyword Research, Analysis and Recommendations.
- Content Feedback & Recommendations.
- Pre-optimization Ranking Report.
- Ranking Capacity and Beta Submission Report and Submission report.
- Phase 2: Implementation Documents: Formulation of implementation documents for each web page to be optimized. Duration of phase 2 would depend on the total number of pages to be optimized and can range between 1 to 2 weeks.
- Phase 3: Implementation and QC: This phase involves creation of different tags, content revisions, page additions, navigation enhancements, etc. The optimized site is tested on a demo location and any discrepancies are taken care of here by our Quality Control Team.
- Phase 4: Final Reports: Generation of the Project Completion and Final Ranking Report on the top 17 search engines.
Throughout each step, the SEO team follows a predefined protocol to ensure that your inputs and feedback are taken and incorporated, wherever possible